The work is in the execution phase of the reinforced concrete structure.
Continuation of the concreting of the vertical elements between Floor -2 and Floor -1
First exposed concrete elements already executed.
Continuation of the concreting of the vertical elements between Floor -2 and Floor -1
First exposed concrete elements already executed.